Deploy Your Data Center in 18 Months, Not 5 Years
Access 1,000 GW of ready grid capacity. Skip the 5-year interconnection queue with surplus interconnection.
1000
GW Available
18
Months Deploy
1000+
Sites Ready
America's AI Infrastructure Bottleneck
The grid can't keep pace with AI's explosive growth. Critical infrastructure is trapped in decade-long queues while the digital economy waits.
0TWh
AI Data Center Demand
Projected energy demand by 2030
0GW
Capacity in Queue
Stuck in interconnection bottlenecks
5-6Years
Average Wait Time
For new grid connections
65-90GW
Data Center Capacity
Needed by 2029 for AI growth
0GW
Total Load Growth
US forecast 2025-2029
0%
Coverage Gap
Only this much peak load growth covered
The Solution: Surplus Interconnection
Deploy clean AI infrastructure in 1-2 years using existing grid connections at underutilized power plants
Who Benefits from WattCanvas?
Our platform serves diverse stakeholders in the energy transition, each gaining unique advantages from surplus interconnection
Data Center Operators
Deploy 3-4 Years Faster
18-month deployment vs 5+ years
95% renewable energy for ESG goals
99.99% uptime guaranteed
Direct cost savings on infrastructure
Renewable Developers
Secure Offtakers Instantly
Find data center customers immediately
No new grid studies needed
Utilize existing interconnections
Accelerated project ROI
Infrastructure Investors
New Asset Class Opportunity
Integrated energy-compute projects
Reduced interconnection risk
Faster returns (18 months to revenue)
$90B+ market opportunity
Public Stakeholders
Economic Growth & Grid Reliability
Repurpose underutilized infrastructure
Create local jobs
Improve grid stability
FERC Order 845 compliant
No matter your role in the energy ecosystem, WattCanvas accelerates your path to success
Surplus Interconnection Configuration
Deploy data centers with 95% renewable energy using existing gas plant interconnections
Configuration Setup
100MW Gas Plant
Existing Infrastructure
100MW Data Center
High-Performance Computing
500MW Solar Array
5x Oversized Capacity
1600MWh Battery
Long-Duration Storage
Key Benefits
95% Renewable Energy
Solar + Storage Primary Power
18-Month Deployment
Skip 5-Year Queue
99.99% Uptime
Gas Backup Reliability
FERC Order 845
Regulatory Compliant
System Architecture
This configuration enables data centers to achieve sustainability goals while maintaining enterprise-grade reliability, all while bypassing traditional interconnection delays.
Deployment Timeline Comparison
Traditional Interconnection
New grid connection, full study process
5-6 Years
Surplus Interconnection
Behind-the-meter, existing connection
1-2 Years
Deploy AI infrastructure 3-4 years faster